Selection of Pavement for Highway Rehabilitation Based on Life-Cycle Cost Analysis: Validation of California Interstate 710 Project, Phase 1 SCIE SCOPUS

Title
Selection of Pavement for Highway Rehabilitation Based on Life-Cycle Cost Analysis: Validation of California Interstate 710 Project, Phase 1
Authors
Lee, EBKim, CHarvey, JT
Date Issued
2011-01
Publisher
National Research Council
Abstract
Life-cycle cost analysis (LCCA) for highway projects is an analytical technique that uses economic principles to evaluate long-term alternafive investment options, especially for comparing the value of alternative pavement structures and strategies. Recently, the California Department of Transportation (Ca !trans) mandated LCCA implementation to evaluate the cost-effectiveness of pavement design alternatives for highway projects in the state. An LCCA approach was utilized for validation of the pavement design on the 1-710 Long Beach rehabilitation project with three pavement types: innovative (long-life) asphalt concrete pavement (ACP), standard-life ACP, and long-life portland cement concrete pavement (PCCP). The LCCA followed the Caltrans procedure and incorporated information filed by the project team. The software tools Construction Analysis for Pavement Rehabilitation Strategies (CA4PFtS) and RealCost were used for quantitative estimates of construction schedule, work zone user cost, and agency cost for initial and future maintenance and rehabilitation activities. Conclusions from the LCCA supported use of the innovative ACP alternative, the one actually implemented in the 1-710 Long Beach project (Phase 1), since the innovative ACP alternative had the lowest life-cycle costs over the 60-year analysis period. For example, the life-cycle agency cost for the innovative ACP alternative ($33.2 million) was about $7.9 million more cost-effective than that of the standard-life ACP alternative ($41.1 million) and about $17.2 million less expensive than the long-life PCCP alternative ($50.4 million). Utilization of the proposed computer tool aided LCCA procedure would contribute substantial economic benefits to nationwide highway projects, especially rehabilitation and reconstruction.
URI
https://oasis.postech.ac.kr/handle/2014.oak/11208
DOI
10.3141/2227-03
ISSN
0361-1981
Article Type
Article
Citation
Journal of the Transportation Research Board, no. 2227, page. 23 - 32, 2011-01
Files in This Item:
There are no files associated with this item.

qr_code

  • mendeley

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher

이을범LEE, EUL BUM
Ferrous & Eco Materials Technology
Read more

Views & Downloads

Browse