DC Field | Value | Language |
---|---|---|
dc.contributor.author | Lee, EB | - |
dc.contributor.author | Ibbs, CW | - |
dc.date.accessioned | 2016-03-31T08:31:56Z | - |
dc.date.available | 2016-03-31T08:31:56Z | - |
dc.date.created | 2013-05-16 | - |
dc.date.issued | 2005-04 | - |
dc.identifier.issn | 0733-9364 | - |
dc.identifier.other | 2005-OAK-0000027580 | - |
dc.identifier.uri | https://oasis.postech.ac.kr/handle/2014.oak/15517 | - |
dc.description.abstract | Most state highways in the United States were built during the 1960s and 1970s with an infrastructure investment of more than $1 trillion. They now exceed their 20 year design lives and are seriously deteriorated. The consequences are high maintenance and road user costs because of degraded road surfaces and construction work zone delays. Efficient planning of highway rehabilitation closures is critical. This paper presents a simulation model, Construction Analysis for Pavement Rehabilitation Strategies (CA4PRS), which estimates the maximum amount of highway rehabilitation/reconstruction during various closure timeframes. The model balances project constraints Such as scheduling interfaces, pavement materials and design, contractor logistics and resources, and traffic operations. It has been successfully used on several urban freeway rehabilitation projects with high traffic volume, including projects on I-10 and I-710. The CA4PRS helps agencies and contractors plan highway rehabilitation strategies by taking into account long-life pavement performance, construction productivity. traffic delay, and total cost. | - |
dc.description.statementofresponsibility | X | - |
dc.language | English | - |
dc.publisher | Journal of Construction Engineering and Management | - |
dc.relation.isPartOf | Journal of Construction Engineering and Management | - |
dc.title | Computer simulation model: Construction Analysis for Pavement Rehabilitation Strategies. | - |
dc.type | Article | - |
dc.contributor.college | 엔지니어링 대학원 | - |
dc.identifier.doi | 10.1061/(ASCE)0733-9364(2005)131:4(449) | - |
dc.author.google | Lee, EB | - |
dc.author.google | Ibbs, CW | - |
dc.relation.volume | 131 | - |
dc.relation.issue | 4 | - |
dc.relation.startpage | 449 | - |
dc.relation.lastpage | 458 | - |
dc.contributor.id | 11118778 | - |
dc.relation.journal | Journal of Construction Engineering and Management | - |
dc.relation.index | SCI급, SCOPUS 등재논문 | - |
dc.relation.sci | SCI | - |
dc.collections.name | Journal Papers | - |
dc.type.rims | ART | - |
dc.identifier.bibliographicCitation | Journal of Construction Engineering and Management, v.131, no.4, pp.449 - 458 | - |
dc.identifier.wosid | 000227755600008 | - |
dc.date.tcdate | 2019-01-01 | - |
dc.citation.endPage | 458 | - |
dc.citation.number | 4 | - |
dc.citation.startPage | 449 | - |
dc.citation.title | Journal of Construction Engineering and Management | - |
dc.citation.volume | 131 | - |
dc.contributor.affiliatedAuthor | Lee, EB | - |
dc.identifier.scopusid | 2-s2.0-15944379640 | - |
dc.description.journalClass | 1 | - |
dc.description.journalClass | 1 | - |
dc.description.wostc | 31 | - |
dc.description.scptc | 39 | * |
dc.date.scptcdate | 2018-05-121 | * |
dc.type.docType | Article | - |
dc.relation.journalWebOfScienceCategory | Construction & Building Technology | - |
dc.relation.journalWebOfScienceCategory | Engineering, Industrial | - |
dc.relation.journalWebOfScienceCategory | Engineering, Civil | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.relation.journalResearchArea | Construction & Building Technology | - |
dc.relation.journalResearchArea | Engineering | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
library@postech.ac.kr Tel: 054-279-2548
Copyrights © by 2017 Pohang University of Science ad Technology All right reserved.