Open Access System for Information Sharing

Login Library

 

Article
Cited 10 time in webofscience Cited 13 time in scopus
Metadata Downloads
Full metadata record
Files in This Item:
There are no files associated with this item.
DC FieldValueLanguage
dc.contributor.authorLee, EB-
dc.contributor.authorLee, H-
dc.contributor.authorIbbs, CW-
dc.date.accessioned2016-03-31T08:32:05Z-
dc.date.available2016-03-31T08:32:05Z-
dc.date.created2013-05-16-
dc.date.issued2007-10-
dc.identifier.issn0733-9364-
dc.identifier.other2007-OAK-0000027571-
dc.identifier.urihttps://oasis.postech.ac.kr/handle/2014.oak/15522-
dc.description.abstractOver the last 5 years the California Department of Transportation (Caltrans) has completed three experimental long-life urban freeway rehabilitation projects by utilizing a fast-track (accelerated) construction approach of around-the-clock operations under extended closure. This paper presents the fast-track rehabilitation approaches and the as-built production rates of major rehabilitation operations monitored at the three experimental projects. The monitoring results show that the contractor's production rates varied considerably depending upon the construction logistics, material delivery and hauling methods, lane-closure tactics, and/or pavement designs being implemented. A higher production rate and a noticeable "learning-curve effect" were observed when full-width rehabilitation was compared with partial-width rehabilitation, when continuous lane reconstruction was compared with random slab replacements, and when full roadbed closures were compared with partial lane closures. Findings in this study suggest that Caltrans should evaluate project-specific conditions and constraints, which might restrict use of a preferred rehabilitation scheme, by taking production rate variances into account when establishing schedule baselines of construction staging plans and incentive/disincentive contracts for urban freeway rehabilitation projects.-
dc.description.statementofresponsibilityX-
dc.languageEnglish-
dc.publisherJournal of Construction Engineering and Management-
dc.relation.isPartOfJournal of Construction Engineering and Management-
dc.subjectRECONSTRUCTION-
dc.titleProductivity Aspects of Urban Freeway Rehabilitation with Accelerated Construction.-
dc.typeArticle-
dc.contributor.college엔지니어링 대학원-
dc.identifier.doi10.1061/(ASCE)0733-9364(2007)133:10(798)-
dc.author.googleLee, EB-
dc.author.googleLee, H-
dc.author.googleIbbs, CW-
dc.relation.volume133-
dc.relation.issue10-
dc.relation.startpage798-
dc.relation.lastpage806-
dc.contributor.id11118778-
dc.relation.journalJournal of Construction Engineering and Management-
dc.relation.indexSCI급, SCOPUS 등재논문-
dc.relation.sciSCI-
dc.collections.nameJournal Papers-
dc.type.rimsART-
dc.identifier.bibliographicCitationJournal of Construction Engineering and Management, v.133, no.10, pp.798 - 806-
dc.identifier.wosid000249843500010-
dc.date.tcdate2019-01-01-
dc.citation.endPage806-
dc.citation.number10-
dc.citation.startPage798-
dc.citation.titleJournal of Construction Engineering and Management-
dc.citation.volume133-
dc.contributor.affiliatedAuthorLee, EB-
dc.identifier.scopusid2-s2.0-34548696404-
dc.description.journalClass1-
dc.description.journalClass1-
dc.description.wostc6-
dc.description.scptc3*
dc.date.scptcdate2018-05-121*
dc.type.docTypeArticle-
dc.relation.journalWebOfScienceCategoryConstruction & Building Technology-
dc.relation.journalWebOfScienceCategoryEngineering, Industrial-
dc.relation.journalWebOfScienceCategoryEngineering, Civil-
dc.description.journalRegisteredClassscie-
dc.description.journalRegisteredClassscopus-
dc.relation.journalResearchAreaConstruction & Building Technology-
dc.relation.journalResearchAreaEngineering-

qr_code

  • mendeley

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher

이을범LEE, EUL BUM
Ferrous & Eco Materials Technology
Read more

Views & Downloads

Browse