DC Field | Value | Language |
---|---|---|
dc.contributor.author | Chang, SY | - |
dc.contributor.author | Hong, Y | - |
dc.contributor.author | Kim, JH | - |
dc.contributor.author | Kim, X | - |
dc.date.accessioned | 2016-04-01T08:49:06Z | - |
dc.date.available | 2016-04-01T08:49:06Z | - |
dc.date.created | 2009-06-04 | - |
dc.date.issued | 1999-12 | - |
dc.identifier.issn | 0953-7287 | - |
dc.identifier.other | 1999-OAK-0000016801 | - |
dc.identifier.uri | https://oasis.postech.ac.kr/handle/2014.oak/28834 | - |
dc.description.abstract | We develop a heuristic algorithm for minimizing the workforce level required to accommodate all the maintenance jobs requested within a specific time interval. Each maintenance job has its own release and due dates as well as the required man-days, and must be scheduled in a noninterrupted time interval, i.e. without preemption. However, the duration of each job is not fixed, but to be determined within a specific range. We show that this problem can be seen as a variant of the two-dimensional bin-packing problem with some additional constraints. We develop a non-linear mixed integer programming model for the proposed problem, and employ some well-known bin-packing algorithms to develop an efficient heuristic algorithm. In order to evaluate the performance of the proposed heuristic, we present a computationally efficient scheme for getting a good lower hound for the actual minimum. The computational experiment shows that the proposed heuristic algorithm performs quite satisfactorily in practice. | - |
dc.description.statementofresponsibility | X | - |
dc.language | English | - |
dc.publisher | TAYLOR & FRANCIS LTD | - |
dc.relation.isPartOf | PRODUCTION PLANNING & CONTROL | - |
dc.subject | maintenance | - |
dc.subject | scheduling | - |
dc.subject | workforce level | - |
dc.subject | bin-packing | - |
dc.title | A heuristic algorithm for minimizing maintenance workforce level | - |
dc.type | Article | - |
dc.contributor.college | 산업경영공학과 | - |
dc.identifier.doi | 10.1080/095372899232605 | - |
dc.author.google | Chang, SY | - |
dc.author.google | Hong, Y | - |
dc.author.google | Kim, JH | - |
dc.author.google | Kim, X | - |
dc.relation.volume | 10 | - |
dc.relation.issue | 8 | - |
dc.relation.startpage | 778 | - |
dc.relation.lastpage | 786 | - |
dc.contributor.id | 10109240 | - |
dc.relation.journal | PRODUCTION PLANNING & CONTROL | - |
dc.relation.index | SCI급, SCOPUS 등재논문 | - |
dc.relation.sci | SCIE | - |
dc.collections.name | Journal Papers | - |
dc.type.rims | ART | - |
dc.identifier.bibliographicCitation | PRODUCTION PLANNING & CONTROL, v.10, no.8, pp.778 - 786 | - |
dc.identifier.wosid | 000084017200008 | - |
dc.date.tcdate | 2019-02-01 | - |
dc.citation.endPage | 786 | - |
dc.citation.number | 8 | - |
dc.citation.startPage | 778 | - |
dc.citation.title | PRODUCTION PLANNING & CONTROL | - |
dc.citation.volume | 10 | - |
dc.contributor.affiliatedAuthor | Chang, SY | - |
dc.contributor.affiliatedAuthor | Hong, Y | - |
dc.identifier.scopusid | 2-s2.0-0033321168 | - |
dc.description.journalClass | 1 | - |
dc.description.journalClass | 1 | - |
dc.description.wostc | 6 | - |
dc.type.docType | Article | - |
dc.subject.keywordAuthor | maintenance | - |
dc.subject.keywordAuthor | scheduling | - |
dc.subject.keywordAuthor | workforce level | - |
dc.subject.keywordAuthor | bin-packing | - |
dc.relation.journalWebOfScienceCategory | Engineering, Industrial | - |
dc.relation.journalWebOfScienceCategory | Engineering, Manufacturing | - |
dc.relation.journalWebOfScienceCategory | Operations Research & Management Science | - |
dc.description.journalRegisteredClass | scie | - |
dc.description.journalRegisteredClass | scopus | - |
dc.relation.journalResearchArea | Engineering | - |
dc.relation.journalResearchArea | Operations Research & Management Science | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
library@postech.ac.kr Tel: 054-279-2548
Copyrights © by 2017 Pohang University of Science ad Technology All right reserved.